3 years ago

Managing uncertainty in design flood magnitude: Flexible protection strategies versus safety factors

When planning flood protection, agencies are confronted with uncertainty in the design flood magnitude. In particular, the required capacity may increase in the future and render the protection insufficient. This problem can be adressed by applying a safety factor to the design capacity. We propose a Bayesian quantitative sequential decision model that identifies a cost‐optimal safety factor in the face of uncertainty. It takes into account the flexibility of the protection system, that is, how costly it is to adjust. We focus on the description of the decision model and on the concept of flexibility, investigating only the effect of uncertainty from the historic flood record. Extension to other types of uncertainty is possible. The model is implemented for a catchment in Germany. Various degrees of uncertainty are investigated by using different lengths of historic records. The optimal safety factor decreases with decreasing uncertainty and with increasing system flexibility.
You might also like
Never Miss Important Research

Researcher is an app designed by academics, for academics. Create a personalised feed in two minutes.
Choose from over 15,000 academics journals covering ten research areas then let Researcher deliver you papers tailored to your interests each day.

  • Download from Google Play
  • Download from App Store
  • Download from AppInChina

Researcher displays publicly available abstracts and doesn’t host any full article content. If the content is open access, we will direct clicks from the abstracts to the publisher website and display the PDF copy on our platform. Clicks to view the full text will be directed to the publisher website, where only users with subscriptions or access through their institution are able to view the full article.